{"id":33890,"date":"2026-11-12T09:52:20","date_gmt":"2026-11-12T09:52:20","guid":{"rendered":"https:\/\/tlc.eu\/access-system-for-15-tanks-in-trzebinia-poland\/"},"modified":"2026-11-18T13:01:40","modified_gmt":"2026-11-18T13:01:40","slug":"access-system-for-15-tanks-in-trzebinia-poland","status":"publish","type":"post","link":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/","title":{"rendered":"Access system for 15 tanks in Trzebinia, Poland\u00a0"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Project: A-3963&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Access system for 15 tanks&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Industrial tanks require permanent access structures that allow operators and maintenance teams to reach roof areas and service zones located at different levels.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In projects involving a larger number of tanks, the access system consists of different configurations of platforms, ladders, stairs and railings, adapted to the geometry and arrangement of individual tanks.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As part of the project in Trzebinia, TLC delivered an access system for 15 tanks for an industrial tank manufacturer.&nbsp; TLC\u2019s scope included preparation of the project documentation, manufacture of the steel structures, coordination of the anti-corrosion protection and on-site installation.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The total weight of the delivered steel structures exceeded 35,000 kg.&nbsp;<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">TLC scope &#8211; platforms, walkways, ladders, stairs and railings&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The project scope included:&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>service platforms on tanks,&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>connecting platforms between tanks,&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>railings with toeboards on tank roofs,&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>technical ladders with safety cages and intermediate platforms,&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>helicoidal stairs.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Different sets and arrangements of these elements were used for individual groups of tanks. The drawing for T1, T2 and T3 shows a separate arrangement for T1 and a common configuration for T2 and T3, including platforms, railings and access elements. In selected configurations, the overall structural height was 12,807 mm, 12,970 mm and 13,786 mm.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Technical specification of the access structures&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The main structures of the access system were manufactured from S235 steel. The access system was executed in class EXC2 in accordance with EN 1090-2, covering requirements related to execution, welding, tolerances and quality control of steel structures.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The platforms and stair elements were made using welded steel gratings with a 34 \u00d7 38 mm mesh. The gratings were hot-dip galvanized.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The main steel structures were protected with a paint system applied by airless spraying, intended for environments with very high corrosivity corresponding to class C5-M.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The project documentation specified:&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>RAL 7035 for the main structural elements,&nbsp;&nbsp;<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>RAL 1021 for railings and ladders.&nbsp;&nbsp;<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For selected elements, the adopted loads were 2.0 kN\/m\u00b2 for platforms, a concentrated load of 1.5 kN and a railing load of 0.3 kN\/m.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Different configurations for individual tanks&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The scope of elements varied depending on the group of tanks. For T1, the system included, among other elements, stairs and platforms, while the T2 and T3 arrangement included a vertical access ladder, platforms and railings on the tanks.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Other configurations included ladders with safety cages, platforms, railings and connections to existing brackets and supports. The drawings specify, among other details, connections between ladders and existing brackets, ladders and platforms, platforms and existing supports, and railings and platforms.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Installation stages&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The installation scope was divided according to groups of tanks. For T1\u2013T3, T4\u2013T5 and T7\u2013T8, the platforms were installed after the upper tank head had been assembled. Platforms on the remaining tanks were installed after the tanks had been delivered to the site.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The remaining platforms, ladders and stairs were intended for installation at height after the tanks had been positioned.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Scope of delivery for 15 tanks&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project in Trzebinia included an<strong><a href=\"https:\/\/tlc.eu\/pl\/our-products\/systemy-dostepowe-dla-przemyslu\/\"> access system <\/a><\/strong>for 15 tanks, consisting of service platforms, connecting walkways, roof railings, access ladders and steel stairs.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">TLC\u2019s scope included project preparation, manufacture of the structures, anti-corrosion protection and installation in Trzebinia. <strong>The total weight of the structures exceeded 35,000 kg.&nbsp;<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Looking for an access system for industrial tanks?&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">TLC prepares project documentation, manufactures and installs steel access structures for industrial tanks. The systems can be adapted to the geometry of the tanks, existing support points and the planned installation sequence.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/tlc.eu\/pl\/kontakt\/\" data-type=\"link\" data-id=\"https:\/\/tlc.eu\/contact\/\">Contact TLC <\/a><\/strong>to discuss the requirements of your project.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n<section data-block_09cd9d6aa5f26abe5da26139fd577931 class=\"section image-carousel aligncenter\">\n  <div class=\"image-carousel__container w-full\">\n          <div class=\"image-carousel__wrapper relative\">\n                  <h2 class=\"image-carousel__heading h2 mb-[4.8rem] tablet:mb-[10rem]\">Gallery <\/h2>\n                <div class=\"image-carousel__slider swiper swiper-container select-none\">\n          <image-carousel :items=\"[{&quot;image&quot;:{&quot;ID&quot;:33858,&quot;id&quot;:33858,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-7&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-7.jpg&quot;,&quot;filesize&quot;:680357,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-7.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-7\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-7&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:40:54&quot;,&quot;modified&quot;:&quot;2026-11-12 09:40:54&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:2000,&quot;height&quot;:1500,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-7-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-7-300x225.jpg&quot;,&quot;medium-width&quot;:300,&quot;medium-height&quot;:225,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-7-768x576.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:576,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-7-1024x768.jpg&quot;,&quot;large-width&quot;:1024,&quot;large-height&quot;:768,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-7-100x75.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:75}}},{&quot;image&quot;:{&quot;ID&quot;:33853,&quot;id&quot;:33853,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-6&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-6.jpg&quot;,&quot;filesize&quot;:729097,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-6.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-6\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-6&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:40:52&quot;,&quot;modified&quot;:&quot;2026-11-12 09:40:52&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:2000,&quot;height&quot;:1500,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-6-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-6-300x225.jpg&quot;,&quot;medium-width&quot;:300,&quot;medium-height&quot;:225,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-6-768x576.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:576,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-6-1024x768.jpg&quot;,&quot;large-width&quot;:1024,&quot;large-height&quot;:768,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-6-100x75.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:75}}},{&quot;image&quot;:{&quot;ID&quot;:33848,&quot;id&quot;:33848,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-5&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-5.jpg&quot;,&quot;filesize&quot;:718331,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-5.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-5\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-5&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:40:49&quot;,&quot;modified&quot;:&quot;2026-11-12 09:40:49&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:2000,&quot;height&quot;:1500,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-5-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-5-300x225.jpg&quot;,&quot;medium-width&quot;:300,&quot;medium-height&quot;:225,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-5-768x576.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:576,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-5-1024x768.jpg&quot;,&quot;large-width&quot;:1024,&quot;large-height&quot;:768,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-5-100x75.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:75}}},{&quot;image&quot;:{&quot;ID&quot;:33873,&quot;id&quot;:33873,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-rysunek&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-rysunek.jpg&quot;,&quot;filesize&quot;:240700,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-rysunek.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-rysunek\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-rysunek&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:41:02&quot;,&quot;modified&quot;:&quot;2026-11-12 09:41:02&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:2021,&quot;height&quot;:1115,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-rysunek-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-rysunek-300x166.jpg&quot;,&quot;medium-width&quot;:300,&quot;medium-height&quot;:166,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-rysunek-768x424.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:424,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-rysunek-1024x565.jpg&quot;,&quot;large-width&quot;:1024,&quot;large-height&quot;:565,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-rysunek-100x55.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:55}}},{&quot;image&quot;:{&quot;ID&quot;:33843,&quot;id&quot;:33843,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-4&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-4.jpg&quot;,&quot;filesize&quot;:812225,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-4.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-4\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-4&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:40:46&quot;,&quot;modified&quot;:&quot;2026-11-12 09:40:46&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:2000,&quot;height&quot;:1500,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-4-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-4-300x225.jpg&quot;,&quot;medium-width&quot;:300,&quot;medium-height&quot;:225,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-4-768x576.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:576,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-4-1024x768.jpg&quot;,&quot;large-width&quot;:1024,&quot;large-height&quot;:768,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-4-100x75.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:75}}},{&quot;image&quot;:{&quot;ID&quot;:33828,&quot;id&quot;:33828,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-1&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-1.jpg&quot;,&quot;filesize&quot;:911518,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-1.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-1\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-1&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:40:38&quot;,&quot;modified&quot;:&quot;2026-11-12 09:40:38&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:1500,&quot;height&quot;:2000,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-1-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-1-225x300.jpg&quot;,&quot;medium-width&quot;:225,&quot;medium-height&quot;:300,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-1-768x1024.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:1024,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-1-768x1024.jpg&quot;,&quot;large-width&quot;:768,&quot;large-height&quot;:1024,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-1-100x133.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:133}}},{&quot;image&quot;:{&quot;ID&quot;:33838,&quot;id&quot;:33838,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-3&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-3.jpg&quot;,&quot;filesize&quot;:448435,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-3.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-3\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-3&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:40:44&quot;,&quot;modified&quot;:&quot;2026-11-12 09:40:44&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:2000,&quot;height&quot;:1500,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-3-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-3-300x225.jpg&quot;,&quot;medium-width&quot;:300,&quot;medium-height&quot;:225,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-3-768x576.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:576,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-3-1024x768.jpg&quot;,&quot;large-width&quot;:1024,&quot;large-height&quot;:768,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-3-100x75.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:75}}},{&quot;image&quot;:{&quot;ID&quot;:33833,&quot;id&quot;:33833,&quot;title&quot;:&quot;tlc-gpi-orlen-walkway-system-2&quot;,&quot;filename&quot;:&quot;tlc-gpi-orlen-walkway-system-2.jpg&quot;,&quot;filesize&quot;:857232,&quot;url&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-2.jpg&quot;,&quot;link&quot;:&quot;https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/tlc-gpi-orlen-walkway-system-2\\\/&quot;,&quot;alt&quot;:&quot;&quot;,&quot;author&quot;:&quot;7&quot;,&quot;description&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;name&quot;:&quot;tlc-gpi-orlen-walkway-system-2&quot;,&quot;status&quot;:&quot;inherit&quot;,&quot;uploaded_to&quot;:33825,&quot;date&quot;:&quot;2026-11-12 09:40:41&quot;,&quot;modified&quot;:&quot;2026-11-12 09:40:41&quot;,&quot;menu_order&quot;:0,&quot;mime_type&quot;:&quot;image\\\/jpeg&quot;,&quot;type&quot;:&quot;image&quot;,&quot;subtype&quot;:&quot;jpeg&quot;,&quot;icon&quot;:&quot;https:\\\/\\\/tlc.eu\\\/wp\\\/wp-includes\\\/images\\\/media\\\/default.png&quot;,&quot;width&quot;:2000,&quot;height&quot;:1500,&quot;sizes&quot;:{&quot;thumbnail&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-2-150x150.jpg&quot;,&quot;thumbnail-width&quot;:150,&quot;thumbnail-height&quot;:150,&quot;medium&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-2-300x225.jpg&quot;,&quot;medium-width&quot;:300,&quot;medium-height&quot;:225,&quot;medium_large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-2-768x576.jpg&quot;,&quot;medium_large-width&quot;:768,&quot;medium_large-height&quot;:576,&quot;large&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-2-1024x768.jpg&quot;,&quot;large-width&quot;:1024,&quot;large-height&quot;:768,&quot;menu-thumb&quot;:&quot;https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-2-100x75.jpg&quot;,&quot;menu-thumb-width&quot;:100,&quot;menu-thumb-height&quot;:75}}}]\" sliderType=\"images\"><\/image-carousel>\n        <\/div>\n      <\/div>\n      <\/div>\n<\/section>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TLC delivered a complete access system for 15 industrial tanks in Trzebinia, Poland. The project included service platforms, connecting walkways, ladders, helicoidal stairs and railings, with over 35,000 kg of steel structures.<\/p>\n","protected":false},"author":7,"featured_media":33866,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[3348],"tags":[8889,8890,3024],"class_list":["post-33890","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-realizacje","tag-acces-system-pl","tag-industrial-tanks-pl","tag-walkway-systems-pl"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Industrial Tank Access Systems \u2013 15 Tanks | TLC<\/title>\n<meta name=\"description\" content=\"Discover how TLC designed, manufactured and installed industrial tank access systems for 15 tanks in Poland, delivering over 35 tonnes of steel structures.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/\" \/>\n<meta property=\"og:locale\" content=\"pl_PL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Industrial Tank Access Systems \u2013 15 Tanks | TLC\" \/>\n<meta property=\"og:description\" content=\"Discover how TLC designed, manufactured and installed industrial tank access systems for 15 tanks in Poland, delivering over 35 tonnes of steel structures.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/\" \/>\n<meta property=\"og:site_name\" content=\"TLC\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-12T09:52:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-18T13:01:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tlc.eu\/app\/uploads\/2026\/11\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1752\" \/>\n\t<meta property=\"og:image:height\" content=\"1118\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Klaudia Kmak\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Klaudia Kmak\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minuta\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/\"},\"author\":{\"name\":\"Klaudia Kmak\",\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/#\\\/schema\\\/person\\\/fabaf70fec2ce07888918f70a1c0b075\"},\"headline\":\"Access system for 15 tanks in Trzebinia, Poland\u00a0\",\"datePublished\":\"2026-11-12T09:52:20+00:00\",\"dateModified\":\"2026-11-18T13:01:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/\"},\"wordCount\":622,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg\",\"keywords\":[\"acces system\",\"industrial tanks\",\"Walkway systems\"],\"articleSection\":[\"Realizacje\"],\"inLanguage\":\"pl-PL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/\",\"url\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/\",\"name\":\"Industrial Tank Access Systems \u2013 15 Tanks | TLC\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg\",\"datePublished\":\"2026-11-12T09:52:20+00:00\",\"dateModified\":\"2026-11-18T13:01:40+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/#\\\/schema\\\/person\\\/fabaf70fec2ce07888918f70a1c0b075\"},\"description\":\"Discover how TLC designed, manufactured and installed industrial tank access systems for 15 tanks in Poland, delivering over 35 tonnes of steel structures.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#breadcrumb\"},\"inLanguage\":\"pl-PL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pl-PL\",\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg\",\"contentUrl\":\"https:\\\/\\\/tlc.eu\\\/app\\\/uploads\\\/2026\\\/11\\\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg\",\"width\":1752,\"height\":1118},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/access-system-for-15-tanks-in-trzebinia-poland\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Access system for 15 tanks in Trzebinia, Poland\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/#website\",\"url\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/\",\"name\":\"TLC EU Steel Equipment | Design & Production\",\"description\":\"\",\"alternateName\":\"TLC\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pl-PL\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/#\\\/schema\\\/person\\\/fabaf70fec2ce07888918f70a1c0b075\",\"name\":\"Klaudia Kmak\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pl-PL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c008f42bc67bf9b5836062ca54093ade991dc6c6897e647f03f02ddc315bac09?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c008f42bc67bf9b5836062ca54093ade991dc6c6897e647f03f02ddc315bac09?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c008f42bc67bf9b5836062ca54093ade991dc6c6897e647f03f02ddc315bac09?s=96&d=mm&r=g\",\"caption\":\"Klaudia Kmak\"},\"url\":\"https:\\\/\\\/tlc.eu\\\/pl\\\/author\\\/k-kmak\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Industrial Tank Access Systems \u2013 15 Tanks | TLC","description":"Discover how TLC designed, manufactured and installed industrial tank access systems for 15 tanks in Poland, delivering over 35 tonnes of steel structures.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/","og_locale":"pl_PL","og_type":"article","og_title":"Industrial Tank Access Systems \u2013 15 Tanks | TLC","og_description":"Discover how TLC designed, manufactured and installed industrial tank access systems for 15 tanks in Poland, delivering over 35 tonnes of steel structures.","og_url":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/","og_site_name":"TLC","article_published_time":"2026-11-12T09:52:20+00:00","article_modified_time":"2026-11-18T13:01:40+00:00","og_image":[{"width":1752,"height":1118,"url":"https:\/\/tlc.eu\/app\/uploads\/2026\/11\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg","type":"image\/jpeg"}],"author":"Klaudia Kmak","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Klaudia Kmak","Est. reading time":"3 minuta"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#article","isPartOf":{"@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/"},"author":{"name":"Klaudia Kmak","@id":"https:\/\/tlc.eu\/pl\/#\/schema\/person\/fabaf70fec2ce07888918f70a1c0b075"},"headline":"Access system for 15 tanks in Trzebinia, Poland\u00a0","datePublished":"2026-11-12T09:52:20+00:00","dateModified":"2026-11-18T13:01:40+00:00","mainEntityOfPage":{"@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/"},"wordCount":622,"commentCount":0,"image":{"@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#primaryimage"},"thumbnailUrl":"https:\/\/tlc.eu\/app\/uploads\/2026\/11\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg","keywords":["acces system","industrial tanks","Walkway systems"],"articleSection":["Realizacje"],"inLanguage":"pl-PL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/","url":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/","name":"Industrial Tank Access Systems \u2013 15 Tanks | TLC","isPartOf":{"@id":"https:\/\/tlc.eu\/pl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#primaryimage"},"image":{"@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#primaryimage"},"thumbnailUrl":"https:\/\/tlc.eu\/app\/uploads\/2026\/11\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg","datePublished":"2026-11-12T09:52:20+00:00","dateModified":"2026-11-18T13:01:40+00:00","author":{"@id":"https:\/\/tlc.eu\/pl\/#\/schema\/person\/fabaf70fec2ce07888918f70a1c0b075"},"description":"Discover how TLC designed, manufactured and installed industrial tank access systems for 15 tanks in Poland, delivering over 35 tonnes of steel structures.","breadcrumb":{"@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#breadcrumb"},"inLanguage":"pl-PL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/"]}]},{"@type":"ImageObject","inLanguage":"pl-PL","@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#primaryimage","url":"https:\/\/tlc.eu\/app\/uploads\/2026\/11\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg","contentUrl":"https:\/\/tlc.eu\/app\/uploads\/2026\/11\/tlc-gpi-orlen-walkway-system-banner-blog-web.jpg","width":1752,"height":1118},{"@type":"BreadcrumbList","@id":"https:\/\/tlc.eu\/pl\/access-system-for-15-tanks-in-trzebinia-poland\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/tlc.eu\/pl\/"},{"@type":"ListItem","position":2,"name":"Access system for 15 tanks in Trzebinia, Poland\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/tlc.eu\/pl\/#website","url":"https:\/\/tlc.eu\/pl\/","name":"TLC EU Steel Equipment | Design & Production","description":"","alternateName":"TLC","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tlc.eu\/pl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pl-PL"},{"@type":"Person","@id":"https:\/\/tlc.eu\/pl\/#\/schema\/person\/fabaf70fec2ce07888918f70a1c0b075","name":"Klaudia Kmak","image":{"@type":"ImageObject","inLanguage":"pl-PL","@id":"https:\/\/secure.gravatar.com\/avatar\/c008f42bc67bf9b5836062ca54093ade991dc6c6897e647f03f02ddc315bac09?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c008f42bc67bf9b5836062ca54093ade991dc6c6897e647f03f02ddc315bac09?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c008f42bc67bf9b5836062ca54093ade991dc6c6897e647f03f02ddc315bac09?s=96&d=mm&r=g","caption":"Klaudia Kmak"},"url":"https:\/\/tlc.eu\/pl\/author\/k-kmak\/"}]}},"_links":{"self":[{"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/posts\/33890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/comments?post=33890"}],"version-history":[{"count":2,"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/posts\/33890\/revisions"}],"predecessor-version":[{"id":33944,"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/posts\/33890\/revisions\/33944"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/media\/33866"}],"wp:attachment":[{"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/media?parent=33890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/categories?post=33890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tlc.eu\/pl\/wp-json\/wp\/v2\/tags?post=33890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}