Skip to content

New gas sphere in Papeete – TLC supports a key energy investment

New gas sphere in Papeete – TLC supports a key energy investment

Project number: E/6377/01

Expansion of gas infrastructure in French Polynesia

To meet growing energy needs and improve supply stability, a new LPG gas sphere is under construction in Papeete, on Tahiti Island. The investment will increase the region’s gas storage capacity by 50% and significantly improve the safety and efficiency of energy distribution. The new tank, over twice the size of the existing one, is a strategic component of French Polynesia’s energy infrastructure modernization.

TLC’s contribution to the project

TLC is supplying an access system and steel helicoidal stairs for this investment, ensuring safe operation of the new installation. The high-quality steel and anti-corrosion protection in the form of hot-dip galvanization guarantee the durability of the structure and resistance to demanding operating conditions.

Cooperation with our client, international reference in boilermaking – structural solution for LPG tank access

In cooperation with TISSOT Industrie, we designed a 23.7-meter-high steel helicoidal staircase, the key element of which is the steel stairs provided by TLC. The client was responsible for manufacturing the steel casing (pylon), an integral part of the entire structure. Additionally, a support structure was installed on the stairs connecting the pylon to the upper platform to support the tank pipelines, ensuring the stability and safety of the entire installation.

Project details

Project significance for the region

This investment plays a crucial role in the development of French Polynesia’s energy infrastructure. Expanding LPG storage capacity will stabilize supply and enhance safety in the region.
TLC’s involvement in this project reaffirms the company’s commitment to high standards and strategic infrastructure projects worldwide.

Contact us to find out how TLC can support your projects.

Want to learn more?
Check out the full case study for detailed information and technical insights: read the case study.

See our other projects

TLC EU Steel Equipment | Design & Production

2400 m³ steel digester in duplex stainless steel – steel structure and access system | Castres, France 

2400 m³ duplex stainless steel digester installed in Castres, France for wastewater treatment applications. TLC delivered the structural design and a hot-dip galvanized steel access system compliant with EN 1993-1-1 and EN 1090 (EXC2), ensuring safe maintenance access and long-term durability.
Read more
TLC EU Steel Equipment | Design & Production

Steel staircase for a food industry facility in Poland

TLC steel staircase for a food industry facility in Nowy Modlin, Poland. 38.7 m high, hot-dip galvanized, anti-slip steps, child-safe balustrades – a safe and durable access system compliant with EU standards.
Read more
TLC EU Steel Equipment | Design & Production

External spiral staircase and service platforms for industrial tanks 

In collaboration with a manufacturer of stainless steel storage tanks we delivered a complete system consisting of an external galvanized steel spiral staircase and service platforms for two industrial tanks. The solution was designed to ensure safe access for daily operation and scheduled maintenance work, in full compliance with EN ISO 14122 requirements for industrial stairs and walkway systems. 
Read more

Let's talk about projects we can do together