Design and Delivery of Complete Steel Communication System for Gas Chimney Stack

Design and Delivery of Complete Steel Communication System for Gas Chimney Stack

We have prepared and fulfilled a complete and durable communication system with platforms, which will guarantee the safety of users in a pure gas chimney stack.

The entire system consists of 3 circumferential platforms, 5 rest platforms, 7 spiral and 1 straight entrance flights of stairs.

The construction was made of s235 steel, which has been hot-dip galvanized – the only exception being the level +95600 platform which was made of stainless steel.

The filling of both the steps and platforms were made of pressed grating 33×33, also hot-dip galvanised.

See our other projects

TLC EU Steel Equipment | Design & Production

Temporary SST spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed temporary SST spiral stairs.
Read more
TLC EU Steel Equipment | Design & Production

New gas sphere in Papeete – TLC supports a key energy investment

A new gas sphere is under construction in Papeete, aiming to increase gas storage capacity by 50% in 2025. The new structure, which is more than twice the size of the existing one, will enhance supply management efficiency and significantly improve LPG storage safety.
Read more
TLC EU Steel Equipment | Design & Production

Modular container stairs for construction sites in Germany

TLC container stairs went to the town of Balingen in Germany.
Read more