Optimization of industrial infrastructure for Nordic Sugar Nakskov in Denmark

Project number: C/3118
In our role within the Nordic Sugar Nakskov project in Denmark, we not only conducted detailed site measurements but also devised practical and functional solutions perfectly tailored to the factory’s specifications. Our platforms and staircases served as crucial infrastructure and were designed with a focus on efficient performance.
Throughout this project, we provided comprehensive support, starting from measurements, through design, all the way to production and transportation. The platforms were installed by Świdnicka Fabryka Urządzeń Przemysłowych, the company supplying evaporators on which our platforms were mounted. The entire process was carried out specifically for Nordic Sugar Nakskov, ensuring an ideal fit for the needs of the respective factory.
Gallery
See our other projects

New gas sphere in Papeete – TLC supports a key energy investment

Modular container stairs for construction sites in Germany
