Skip to content

Optimization of industrial infrastructure for Nordic Sugar Nakskov in Denmark

Optimization of industrial infrastructure for Nordic Sugar Nakskov in Denmark

Project number: C/3118

In our role within the Nordic Sugar Nakskov project in Denmark, we not only conducted detailed site measurements but also devised practical and functional solutions perfectly tailored to the factory’s specifications. Our platforms and staircases served as crucial infrastructure and were designed with a focus on efficient performance.

Throughout this project, we provided comprehensive support, starting from measurements, through design, all the way to production and transportation. The platforms were installed by Świdnicka Fabryka Urządzeń Przemysłowych, the company supplying evaporators on which our platforms were mounted. The entire process was carried out specifically for Nordic Sugar Nakskov, ensuring an ideal fit for the needs of the respective factory.

See our other projects

TLC EU Steel Equipment | Design & Production

Temporary SST spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed temporary SST spiral stairs.
Read more
TLC EU Steel Equipment | Design & Production

New gas sphere in Papeete – TLC supports a key energy investment

A new gas sphere is under construction in Papeete, aiming to increase gas storage capacity by 50% in 2025. The new structure, which is more than twice the size of the existing one, will enhance supply management efficiency and significantly improve LPG storage safety.
Read more
TLC EU Steel Equipment | Design & Production

Modular container stairs for construction sites in Germany

TLC container stairs went to the town of Balingen in Germany.
Read more