Temporary SST spiral stairs for PGNiG Termika – Pniówek Plant

As part of the “Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3” project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed temporary SST spiral stairs.
Key project details:
Project: E/3257
Client: PGNiG Termika
Structure type: SST spiral stairs
Structure weight: 2,121 kg
Corrosion protection: hot-dip galvanization
Project location: Poland
Installation: by TLC
Project scope and objectives
The Pniówek Plant was expanded with additional material storage facilities in the form of silos, supplied by the general contractor – a consortium of Ecoserv Sp. z o.o. and Ecosorbtech Sp. z o.o. This expansion required customized access solutions, which is why TLC provided steel spiral stairs SST to ensure safe and convenient access to monitoring and process control equipment.
Durable and reliable construction
Our SST spiral stairs are made of hot-dip galvanized steel, providing high corrosion resistance and ensuring long-term durability in demanding industrial environments. Their compact design and robust construction make them an ideal solution for sites where optimal space utilization is crucial.
Expertise and precision
Thanks to our extensive experience and attention to detail, the temporary SST spiral stairs delivered for PGNiG Termika fully meet the investor’s requirements, guaranteeing durability, safety, and functionality.
Discover more of our completed projects in industrial access systems and modular steel structures!
See our other projects

New gas sphere in Papeete – TLC supports a key energy investment

Modular container stairs for construction sites in Germany
