Skip to content

TAS Temporary stairs can now be used as temporary gangway

TAS Temporary stairs can now be used as temporary gangway

TLC’s Research and Development department finished another stage of TAS system development by implementing Temporary Modular Stairs with possibility to use them as a temporary gangway.

Dangerous zones within the construction site, and communication routes should be well thought-out. In terms of pedestrian communication, standards determine the location and organization of protection systems, such as: Edge Protection System or Temporary Acces Stairs and gangways. Walkway systems have to be maintained in proper technical condition, safe and be a convenient part of the entire walkway systems.

TAS stairs system is a durable, multi-functional construction which guarantees safe communication even in the most demanding conditions. The gangway, with a wide angle adaptation, was designed to allow people to overcome excavations or field drains during construction or road works, with possibility of fast and easy relocation.

To learn more about our TAS system, visit our website and check out our catalogue.

See our other projects

TLC EU Steel Equipment | Design & Production

External spiral staircase and service platforms for industrial tanks 

In collaboration with a manufacturer of stainless steel storage tanks we delivered a complete system consisting of an external galvanized steel spiral staircase and service platforms for two industrial tanks. The solution was designed to ensure safe access for daily operation and scheduled maintenance work, in full compliance with EN ISO 14122 requirements for industrial stairs and walkway systems. 
Read more
TLC EU Steel Equipment | Design & Production

Comprehensive system of aircraft maintenance platforms 

For one of Europe’s leading aircraft manufacturers, TLC developed a set of three service platforms designed directly on the basis of the client’s technical documentation and adapted to the specific requirements of aircraft maintenance operations. 
Read more
TLC EU Steel Equipment | Design & Production

Spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed spiral stairs.
Read more

Let's talk about projects we can do together