Skip to content

EPS Edge Protection System used at the „Moje Miejsce” construction site in Warsaw

EPS Edge Protection System used at the „Moje Miejsce” construction site in Warsaw

Moja Miejsce (eng. My Place) is the project realised in Warsaw which includes great and multi-functional ensemble of buildings. Our EPS Edge Protection System provide safety for the construction site workers working on heights.

One of the office buildings have already been finished with first service and office facilities opened. The second one and the living compartments with 244 flats are now under construction.

Echo Investment, which is the general contractor, provides a smart system “Echo Smart”, which allows remote control over the flat e.g. to manage the blinds, flat temperature etc.

See our other projects

TLC EU Steel Equipment | Design & Production

Temporary SST spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed temporary SST spiral stairs.
Read more
TLC EU Steel Equipment | Design & Production

New gas sphere in Papeete – TLC supports a key energy investment

A new gas sphere is under construction in Papeete, aiming to increase gas storage capacity by 50% in 2025. The new structure, which is more than twice the size of the existing one, will enhance supply management efficiency and significantly improve LPG storage safety.
Read more
TLC EU Steel Equipment | Design & Production

Modular container stairs for construction sites in Germany

TLC container stairs went to the town of Balingen in Germany.
Read more