Skip to content

TUP loading platforms for plastic recycling plant construction

TUP loading platforms for plastic recycling plant construction

We have introduced our TUP unloading platforms into the active phase of the Plastic Recycling Plant construction in Krakow. Our products not only enhance the efficiency of work on the construction site but also represent a significant step towards environmental protection.

Thanks to the TUP platforms, the process of material transport and unloading becomes smoother and safer. These mobile platforms provide access to different levels of elevated buildings, eliminating the need for costly and time-consuming construction elevators. This not only optimizes work but also minimizes the negative environmental impact.

Additionally, on the construction site, we have installed full SMART temporary fences equipped with barbed wire for added security.

Our commitment to delivering innovative solutions for construction goes hand in hand with our concern for the planet’s future. Together with the Plastic Recycling Plant project, we are paving the way towards a more sustainable tomorrow.

See our other projects

TLC EU Steel Equipment | Design & Production

External spiral staircase and service platforms for industrial tanks 

In collaboration with a manufacturer of stainless steel storage tanks we delivered a complete system consisting of an external galvanized steel spiral staircase and service platforms for two industrial tanks. The solution was designed to ensure safe access for daily operation and scheduled maintenance work, in full compliance with EN ISO 14122 requirements for industrial stairs and walkway systems. 
Read more
TLC EU Steel Equipment | Design & Production

Comprehensive system of aircraft maintenance platforms 

For one of Europe’s leading aircraft manufacturers, TLC developed a set of three service platforms designed directly on the basis of the client’s technical documentation and adapted to the specific requirements of aircraft maintenance operations. 
Read more
TLC EU Steel Equipment | Design & Production

Spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed spiral stairs.
Read more

Let's talk about projects we can do together