Skip to content

Double-flight emergency staircase for Sanok Rubber

Double-flight emergency staircase for Sanok Rubber

Project number: D/3181

Our client, Sanok Rubber, entrusted us with the design, production, delivery, and assembly of a new double-flight emergency staircase with a height of 7410 mm.

The structure is made from S235/S355 steel, hot-dip galvanized in accordance with the PN-EN 1461 standard. The staircase is equipped with a double-sided safety railing, consisting of vertical bars. The steps and landings are made from welded grating, capable of withstanding a load of 5 kN/m². The structure meets the EXC2 execution class standards (according to EN 1090-2).

Check out our full range of industrial stairs!

See our other projects

TLC EU Steel Equipment | Design & Production

Comprehensive system of aircraft maintenance platforms 

For one of Europe’s leading aircraft manufacturers, TLC developed a set of three service platforms designed directly on the basis of the client’s technical documentation and adapted to the specific requirements of aircraft maintenance operations. 
Read more
TLC EU Steel Equipment | Design & Production

Spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed spiral stairs.
Read more
TLC EU Steel Equipment | Design & Production

New gas sphere in Papeete – TLC supports a key energy investment

A new gas sphere is under construction in Papeete, aiming to increase gas storage capacity by 50% in 2025. The new structure, which is more than twice the size of the existing one, will enhance supply management efficiency and significantly improve LPG storage safety.
Read more

Let's talk about projects we can do together