Skip to content

Installation of smart panels for oncology hospital in Wroclaw

Installation of smart panels for oncology hospital in Wroclaw

We have delivered and installed over 600 Smart panels for PORR.

These panels have been installed as part of the fencing system at the construction site of the new Oncology Hospital in Wrocław, which is a part of an investment worth 1.055 billion PLN. This hospital will occupy a 22-hectare plot, and its construction is expected to take 51 months. The first patients are planned to be admitted to the facility in 2028.

We are delighted to contribute to the construction of such an important facility that will have a significant impact on improving healthcare in the region.

See our other projects

TLC EU Steel Equipment | Design & Production

Self-supporting staircase by silos – safe access in a food industry plant

TLC delivered an industrial steel staircase access system with landings, welded grating, protective railings and hot-dip galvanizing, developed for safe movement in demanding industrial conditions.
Read more
TLC EU Steel Equipment | Design & Production

2400 m³ steel digester in duplex stainless steel – steel structure and access system | Castres, France 

2400 m³ duplex stainless steel digester installed in Castres, France for wastewater treatment applications. TLC delivered the structural design and a hot-dip galvanized steel access system compliant with EN 1993-1-1 and EN 1090 (EXC2), ensuring safe maintenance access and long-term durability.
Read more
TLC EU Steel Equipment | Design & Production

Steel staircase for a food industry facility in Poland

TLC steel staircase for a food industry facility in Nowy Modlin, Poland. 38.7 m high, hot-dip galvanized, anti-slip steps, child-safe balustrades – a safe and durable access system compliant with EU standards.
Read more

Let's talk about projects we can do together