Mobilt fencing – securing Torun east railway station

Mobilt fencing – securing Torun east railway station

Our temporary Mobilt fences have been delivered to Toruń, where they play an important role as a security measure for the construction site of the neogothic Toruń Wschodni PKP train station. This historical building, constructed in 1909, is currently undergoing extensive renovations to restore its former splendor.

As part of this project, both the facade and the interior of the train station will undergo restoration. The waiting areas will feature new ergonomic benches, modern lighting, display cases with schedule information, as well as electronic arrival and departure boards. On the ground floor of the station, there will be a space with a mezzanine available for rent, as well as a hostel area, which will also be located on the upper floor of the building.

Our Mobilt temporary fences will play a crucial role in ensuring a safe environment around the construction site, enabling smoother and safer progress during the renovation of Toruń Wschodni train station. As a result, the building will regain its historical beauty, while the interiors will be designed in a modern style, preserving the original historical details.

See our other projects

TLC EU Steel Equipment | Design & Production

External spiral staircase and service platforms for industrial tanks 

In collaboration with a manufacturer of stainless steel storage tanks we delivered a complete system consisting of an external galvanized steel spiral staircase and service platforms for two industrial tanks. The solution was designed to ensure safe access for daily operation and scheduled maintenance work, in full compliance with EN ISO 14122 requirements for industrial stairs and walkway systems. 
Read more
TLC EU Steel Equipment | Design & Production

Comprehensive system of aircraft maintenance platforms 

For one of Europe’s leading aircraft manufacturers, TLC developed a set of three service platforms designed directly on the basis of the client’s technical documentation and adapted to the specific requirements of aircraft maintenance operations. 
Read more
TLC EU Steel Equipment | Design & Production

Spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed spiral stairs.
Read more