TUP unloading platform – Bydgoszcz (Poland)

TUP unloading platform – Bydgoszcz (Poland)

Unloading platform is best solution that facilitates transport and safe unloading of materials between building tiers at construction sites.

TUP platform form TLC received positive result of the IMBiGS institute according to PN-EN 12811-3 standard guidelines.

The customer can adjust the equipment to his own needs, thanks to 3 variants of the width of the platform:

  • 1,2 m,
  • 1,5 m,
  • 2,2 m.

Using TUP platforms is a great alternative to construction lift – which are much more expensive.

The characteristics of our product, is  their high mobility – the same is the case with platforms. We provide easy assembly and disassembly.

In order to adjust the offer of unloading platforms to individual needs, please contact us.

Below we present photos from the construction of the Enklawa Apartment buildings in Bydgoszcz, where TUP unloading platforms were used.

See our other projects

TLC EU Steel Equipment | Design & Production

External spiral staircase and service platforms for industrial tanks 

In collaboration with a manufacturer of stainless steel storage tanks we delivered a complete system consisting of an external galvanized steel spiral staircase and service platforms for two industrial tanks. The solution was designed to ensure safe access for daily operation and scheduled maintenance work, in full compliance with EN ISO 14122 requirements for industrial stairs and walkway systems. 
Read more
TLC EU Steel Equipment | Design & Production

Comprehensive system of aircraft maintenance platforms 

For one of Europe’s leading aircraft manufacturers, TLC developed a set of three service platforms designed directly on the basis of the client’s technical documentation and adapted to the specific requirements of aircraft maintenance operations. 
Read more
TLC EU Steel Equipment | Design & Production

Spiral stairs for PGNiG Termika – Pniówek Plant

As part of the "Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3" project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.A. – Pniówek Plant, TLC designed, manufactured, and installed spiral stairs.